In Nuts and Bolts factory, one machine produces only nuts at the rate of 100 nuts per minute and needs to be cleaned for 5 minutes after production of every 1000 nuts. Another machine produces only bolts at the rate of 75 bolts per minute and needs to be cleaned for 10 minutes after production of every 1500 bolts. If both the machines start production at the same time, what is the minimum duration required for producing 9000 pairs of nuts and bolts?

 

1. 130 minutes

2. 135 minutes

3. 170 minutes

4. 180 minutes

    
Goel (2)

Olaaa!! Perrrfect answer. 0  [1 rates]

Goel's Avatar

total posts: 4    
Offline

3. 170 minutes

  this reply:   0 points  (with Olaaa!! Perrrfect answer.   in 0   votes   )     [?]
 
You have to be logged on to rate
  
 
reply Forum Index -> CAT
Go to: 
Sponsored Links
Preparing for CAT 2010?
solved, model paper, prelim monitor
online, study material. Buy Online!

goBSkool.com/CAT-MAT

Preparing for MAT 2010?
solved, model paper, prelim monitor
online, study material. Buy Online!

goBSkool.com/CAT-MAT

Free Exam Papers ?
unit, model, solved papers
IIT, Medical, CBSE. Get Free Now!

vriti.com/Scholarship